Civil and infrastructure | ATUM
Skip to content

Industry

Civil and infrastructure

Dust and erosion control during earthworks, and revegetation of batters and corridors at completion.

Book a site assessment

The context

What these sites deal with

Road, rail, subdivision and utility projects expose large areas for months, often next to neighbours, roads and waterways. Environmental management plans and council or EPA conditions set dust and sediment limits, and the final handover usually depends on vegetation being established.

Typical needs

What usually has to be solved

  • Erosion and sediment control plans that are staged with the works
  • Dust control on active earthworks and site access roads
  • Temporary stabilisation of stockpiles and finished surfaces
  • Hydroseeding and hydromulching of batters, drains and verges
  • Meeting practical completion and defect period vegetation requirements

Our approach

How ATUM fits in

I fit the plan around staged works, treating areas as they finish rather than waiting for the whole site. A written specification lets your earthworks contractor price the application, and re-application planning keeps control in place across the program.

Have a site with dust or rehabilitation conditions to meet?

Send the location, area and what you need to meet. I will come back with what an assessment would cover and a fixed fee where I can, with no obligation to go further.

ATUM

Revegetation & Dust Suppression

ATUM is an independent consultancy for mining, civil, energy and defence sites. I assess what your dust or rehabilitation conditions actually require, write the plans and specifications your approval calls for, and arrange or oversee the application so the result holds.

Independent consulting, Australia-wide.

Explore

ServicesIndustriesSolutionsAboutResourcesContactCase studies

Contact

0478 592 052

Or use the enquiry form.

© 2026 ATUM. Privacy policy to be published.