Rehabilitate disturbed land | ATUM
Skip to content

Solution

Rehabilitate disturbed land

Re-establish stable vegetation on ground disturbed by mining, construction or infrastructure works.

Book a site assessment

The context

The situation

Whether it is progressive rehabilitation on a mine, reinstatement at the end of a civil job, or restoring a corridor after construction, the requirement is the same: stable ground with an agreed level of vegetation cover, achieved within a set time.

Typical needs

What usually has to be solved

  • Scoping of what the area actually needs to meet its conditions
  • A seed mix and mulch rate suited to soil, slope and end land use
  • Application on batters and areas machinery cannot reach
  • Timing that gives germination the best chance in your region
  • Monitoring and reporting against the completion criteria

Our approach

How ATUM fits in

Hydroseeding and hydromulching treat difficult ground in one pass with seed, mulch and binder. I scope and plan the rehabilitation first, specify the mix and the window, and set the monitoring so the first attempt is the one that works and the result can be shown.

Have a site with dust or rehabilitation conditions to meet?

Send the location, area and what you need to meet. I will come back with what an assessment would cover and a fixed fee where I can, with no obligation to go further.

ATUM

Revegetation & Dust Suppression

ATUM is an independent consultancy for mining, civil, energy and defence sites. I assess what your dust or rehabilitation conditions actually require, write the plans and specifications your approval calls for, and arrange or oversee the application so the result holds.

Independent consulting, Australia-wide.

Explore

ServicesIndustriesSolutionsAboutResourcesContactCase studies

Contact

0478 592 052

Or use the enquiry form.

© 2026 ATUM. Privacy policy to be published.